Engineering

Design and development officeOver 50 years of experienceSolbiate Arno, Italy
ISELFA suspension clamp for 1000 kV lines, cut out

From your request
to the best solution.

Every technical request is assessed by our design and development office and turned into the right solution, following defined design procedures: 2D and 3D modelling, FEM analysis, dies, prototypes and testing.

2D and 3D modelling/FEM analysis/Dies and tooling/Functional prototypes/2D and 3D modelling/FEM analysis/Dies and tooling/Functional prototypes/
From 66 to 1000 kV/Over 10,000 components/To customer specification/From 66 to 1000 kV/Over 10,000 components/To customer specification/From 66 to 1000 kV/Over 10,000 components/To customer specification/

Engineering office

From drawing to test,
all under one roof.

Data acquisition station next to a test bench in the ISELFA laboratory

50+

years of experience designing and manufacturing high-voltage line fittings

Every technical request is assessed and turned into the most suitable solution.

ISELFA has its own design and development office, working hand in hand with the in-house testing laboratory.

Products start from standard designs and are customised to the customer's specification.

2D and 3D modelling

Every component is drawn and modelled before production.

FEM analysis

Design verification with calculations or dedicated modelling software.

Dies and tooling

Design of the dies and tooling needed for production.

Functional prototypes

Prototypes built for laboratory testing.

Method

How a component
is born.

After testing, the design goes back for review: the loop closes and starts again.

01Planning of design and production process
  1. 01Planning of design and production process
  2. 02Analysis of design input data
  3. 032D and 3D modelling
  4. 04Design of dies and tooling
  5. 05Construction of functional prototypes
  6. 06Design verification by calculation or modelling software
  7. 07Electrical, mechanical or component-specific tests
  8. 08Design review based on laboratory results

From calculation to test

Verified
by calculation,
confirmed
by testing.

The design is verified with calculations or dedicated modelling software. The prototype then undergoes electrical and mechanical tests, or the specific tests required for the component, and the design is reviewed in the light of the laboratory results.

0kN

0Test load on the C-yoke930 kN

C-yoke under tensile test at 930 kN
C-yoke test · 930 kN

Developments

Designed by us,
installed on power lines.

Over the years our engineering office has developed new components for specific line requirements: aeolian vibration, ice, conductor bundles and high-temperature conductors.

Aeolian vibration2000

Stockbridge dampers 2R, 3R and 4R

Able to absorb aeolian vibration across the full range of conductors, earthwires and OPGW.

Ice2018

Anti-rotation devices

Development and production of anti-rotation devices that prevent ice sleeves forming on conductors, to Terna specification and for export markets.

Conductor bundles2018

Spacer dampers

Twin, triple and quad types for many different conductors: they keep the sub-conductors of the bundle apart and damp their oscillations.

High temperature2019

Fittings for HTLS conductors

Dedicated design of fittings for high-temperature low-sag conductors, in Italy and abroad.

What we design

Over 10,000 components,
each one to specification.